Menu path
Reporting > Supply+Install
The Supply+Install report provides a complete cost breakdown including materials and labour charges. This report takes into account stages defined using Stage Manager (such as first storey, second storey, roof material and trim) and displays both material costs and installation charges.
β
π§Ύ How Supply and Install reporting works
When you access Reporting > Supply+Install, all materials are automatically tallied, sorted and displayed in the Materials dialog. Labour charges are calculated and shown in the Labour Sub-total dialog.
β
The title bar shows the current quote name and which page is displayed. This dialog is similar to Supply-Only reporting, but allows you to modify labour charges and assign markup percentages to both labour and material charges.
β
π§ Modifying report items
Any line item in the Supply and Install list can be modified:
Double-click the line item you want to change
Edit the description as needed
Type calculations directly into the field
Note: Changes made here will only affect the current job and are saved when you hit the [Save] button. provide a Quote Name. This allows you to create variations on the quote for this job.
When you re-enter the Supply and Install or Supply Only function you will be prompted for to Re-Calculate the quote or recover an existing quote:
π Labour Sub-total details
Click Labour Sub-total to open the Roofing labour charges dialog. This shows:
Field | Description |
Quantity | Amount of work for each item |
Rate | Cost per unit for each item |
Total | Individual totals (quantity Γ rate) |
Most items and rates come from the Reporting labour-rates dialog plus items defined in Set-Up > Extras. The User Lengths value is derived from the Cover > Flashing > User-Lengths command.
β οΈ Important notes about quantities
Quantities displayed are either NETT or GROSS depending on your settings in Set Up > Metal-Rates dialog.
π‘ Tip: If you need pay rates that account for roof pitch, use Tiler's Pay where you can define multiple pitch intervals.
π§Ύ Markup and totals breakdown
Field | Description |
Labour markup | The labour mark-up percentage |
Labour total | Labour total including mark-up percentage |
Material subtotal | Sum of all material costs |
Material markup | Material mark-up percentage |
Material total | Material total including mark-up percentage |
Job total | Total cost including material and labour |
π§ Modifying the quote total
The Modify Quote Total option lets you adjust the final quotation price:
Double-click in the Job Total price cell
Enter the new job selling price
The adjustment appears in the Rebate/Extra field
The system shows:
Negative numbers: Rebate or discount
Positive numbers: Extra or additional amount
This adjustment is saved as Key Text called ###Rebate and can be displayed on quotations by adding the Key-Text String to your office copy template.
π‘ Additional features
The report includes:
Totals for each line item on the right
Cost per unit area options for both Materials and Labour
Help understanding estimating pricing against roof and wall areas
Sales tax is applied if defined in System Preferences, and the total (including tax if applicable) is displayed - this amount appears on the customer's quotation.
π Extra items
For details about configuring Extra items that appear in labour calculations, refer to Set-Up > More... > Extras.