Menu path
Set-Up > Pay Rates > Curved Metal Pay Rates
What it does
This feature allows you to set up labour pay rates specifically for curved metal roofing installations. Curved metal roofing refers to metal sheeting installed on curved or barrel-shaped roof sections, which typically requires different installation techniques and labour rates compared to standard flat metal roofing.
You select a pay schedule for a job on the Cover > Select Metal dialog box when setting up your project materials.
π§Ύ Pay Schedule Settings
Field | Description |
Name | The name of this pay schedule |
Storey | The storey to which the following rates apply. A schedule can have up to 10 storeys |
Pitch Intervals | The pitch intervals you want to set for the job. Set them by clicking the Intervals button at the bottom of the dialog. To edit a column of values, click on the interval value |
Line items | For each line item, enter the rate per unit area or length for that line item. For roof removal and gutter removal, only the first pitch interval rate is read when reporting is performed |
π§ Control Buttons
Button | Function |
Select | Lists existing schedules. Select the one you want for editing. After selecting a schedule, the Update button appears allowing you to update the schedule |
Delete | Deletes the currently selected schedule |
Add | Adds the current schedule (schedules must have unique names) |
Cancel | Closes the dialog box without saving changes |
Intervals | Allows you to define the pitch intervals you want to use |
OK | Closes and saves the changes you have made |
π‘ When to Use Curved Metal Rates
Use curved metal pay rates when:
Installing metal roofing on curved or barrel-shaped roof sections
Labour rates differ from standard metal roofing due to increased complexity
You need pitch-specific rates for curved installations
Estimating projects with specialised curved metal work
β οΈ Important Notes
Schedules must have unique names
For roof removal and gutter removal line items, only the first pitch interval rate is used in reporting calculations
You can set up to 10 storeys per schedule
Pitch intervals are defined using the Intervals button

