Why am I getting flashings on my tile job in Costing > Supply and Install when I didn’t select any?

Stop unwanted flashings being added to tile jobs during Costing > Supply and Install when Stage Manager is enabled.

Updated over a week ago

✅ Why this happens

This will occur if you have Stage Manager turned on,

and a default set of flashings defined under Cover > Flashings.

The Stage Manager sees that you have defined a set of flashings, and you have included them in the various stages, and assumes that you forgot to generate the cutting list, so goes ahead and adds them to the job, even though you don't need them, because it is a tile roof.


🛠️ Fix: Reset flashings to None

  1. Go to Cover > Flashings

  2. Reset the list to [None]

With none set, the Stage Manager assumes that none are required and skips this step.


🧩 Optional: Adjust Stage inclusions (tile workflows)

If you're a tile guy you could also simply not include Fascia and Gutter etc, from each stage when you're defing the inclusions for each stage.

Note that most tile guys do not do fascia and gutter, this stuff is done by other sub-contractors.